Bainona

Dolphin Energy EPRS Marine Base Project 3

Dolphin Energy EPRS Marine Base Project

Revolutionizing Industrial Spaces: Bainona’s Commitment to Excellence and Innovation in the UAE”

Bainona is redefining industrial and warehouse spaces in the UAE, showcasing a blend of functionality and futuristic design. Projects like the EPRS Marine Base and Leaders Marine Factory demonstrate our expertise in integrating state-of-the-art facilities with innovative design. We’ve played a pivotal role in the NPCC IFY Yard development, handling diverse aspects from administrative buildings to workshops, reflecting our ability to meet complex industrial needs.

Our versatility is evident in projects like the Tawasul Taxi Base and Al Ain Coop Society Stores, catering to various sector demands with precision. We also pride ourselves on combining utility and aesthetics in projects like the Liwa Marine ICAD Facility and the Gloves Manufacturing Plant, which are modern industrial architecture icons.

Our comprehensive portfolio includes the Saif Al Khaily Group’s offices, the Hamad Mubarak Al Shamsi ICAD Showroom, and the Workers’ Accommodation & Taxi Base, highlighting our commitment to employee welfare and holistic industrial development.

At Bainona, we focus on driving innovation and excellence in the UAE’s industrial and warehouse sectors with each project we undertake.

 

 

Project Title Dolphin Energy EPRS Marine Base Project
Location Abu Dhabi – KIZAD
Client Dolphin Energy Limited
Completion Date Expected 2018
Project Value AED 48,000,000
Engineering Services Design & Supervision
Scope of Works Architectural, Structural & MEP Design

Specification & BOQ

Feasibility study

Construction supervision

Built up Area 17,200. sq.m.
Project Levels Ground
Project Description The project has been commissioned to us by Dolphin Energy to store EPRS equipment’s in a custom designed warehouse. It is one of its kind ever been constructed in the UAE.

The project is located in KIZAD area Abu Dhabi. The Project accommodate the following functions:

•           Indoor Storage

All the EPRS equipment and line pipe materials shall be stored indoors, in a shaded, ventilated and dust free environment suitable for general mechanical maintenance.

•           EPRS Equipment

The storage includes: EPRS equipment, workshop, potentially a water testing tank, and for future expansion.

•           Line Pipe Materials

Storage is also required for the concrete-coated line pipe materials. The average length of the individual line pipe sections is around 12.2m and, the maximum OD is 54”.

•              Offices

Project Components The project consist of:

Equipment’s store

Pipe store

Office building

 

 

OK- APPROVED

 

 

Back to Home